-
Services
-
expand_more
Back
Services
-
-
expand_more
Back
Rates & Property
- Setting the Rates
- Revaluation and how it affects rates
- Rates Dates & Payment Options
- Changing your details
- Property Information Search
- Online Rates Payments
- Rates Rebates, Remission & Postponement
- Short-Term Visitor Accommodation
- Queenstown CBD Transport Rate for Queenstown Town Centre Properties
- Wastewater Rates for Cardrona
- Other Information
- Rates FAQs
-
-
expand_more
Back
Rubbish & Recycling
- How we recycle in the Queenstown Lakes District
- Cut your waste
- Commercial Services
- Rubbish & Recycling Collection
- Recycling Centres
- Transfer Stations
- Solid Waste Assessment
- Waste Minimisation Community Fund
- Waste Minimisation for Businesses
- Zero Waste Events
- Green and food waste
- Construction and demolition waste
-
-
expand_more
Back
Resource Consents
- Do I need a resource consent?
- Change, extend or surrender a resource consent
- Apply for a resource consent
- Non-compliance & monitoring
- Submitting on a notified resource consent
- Subdividing and Land Development
- Need help?
- Current resource consents
- eDocs
- FAQs
- Practice notes and guidance
-
-
expand_more
Back
Alcohol Licensing
- Alcohol Public Notices
- Find the right alcohol licence and apply
- Alcohol licence fee calculator
- Renew and/or vary your alcohol licence
- Manager's certificates
- Legal requirements for licence holders
- District Licensing Committee decisions
- ARLA annual report
- Alcohol-Free Areas In Public Places
- Have your say on alcohol licence applications
- All alcohol licensing forms
- Gambling Information
-
-
Do It Online
-
expand_more
Back
Do It Online
-
-
expand_more
Back
Registrations
- Register your Dog
- Register for a transfer or refund of dog registration fee
- Renewal for Hairdressers, Campgrounds, and Offensive Trade Registrations
- Activities in a Public Place - Application Form
- Register as a Homestay
- Register as Residential Visitor Accommodation
- Register for our public notification list
- Register to speak at Public Forum
- Register for Kerbside Collection Services
- No Spray Register
-
Community
Community
Ngā Hapori
- Manaaki
- Summerdaze
- Welcoming Communities
- Arts, Culture and Heritage
- Community Connect
- Citizenship Ceremonies
- Community Associations and Groups
- Community Funding
- Community Research
- Community Wellbeing
- Economic Development
- Emergency Management
- Energy Saving Tips
- Event Planning and Venues
- Māori Community
- Managing the risk of wildfire
- Population and Demand
- Tuia Programme
- Venue Hire
- Winterdaze
Tuia Programme
Applications for the Tuia Programme 2025 are now open.
-
Recreation
Recreation
Kā mahi a te rēhia
- Queenstown Events Centre
- Wānaka Recreation Centre
- Paetara Aspiring Central
- Swim
- Learn to Swim
- Golf
- Kids' Recreation
- Sport & Rec Venues and Contacts
- Courts and Fields
- Memberships - Join Today
- Join the Sport & Rec Team
- Responsible Camping in the Queenstown Lakes District
- Parks and Walkways
- Lakes and Boating
- Mountain Biking
- Horse Riding
- Splash Café
- Wallis Physiotherapy
- Alpine Physiotherapy
- Physiotherapy
- Playgrounds
- School Holiday Programmes
- Mascot Search
Arrowtown Memorial Pool
Opens 30 November
-
Your Council
-
expand_more
Back
Your Council
-
-
expand_more
Back
Council Documents
- Long Term Plan (LTP)
- Archived Agendas & Minutes
- Annual Plans
- Annual Reports
- Asset Management Plans
- Awarded Council Contracts
- Bylaws
- Capex Quarterly Update
- Monthly Reports
- National Policy Statement - Urban Development 2020 (NPS-UD)
- Policies
- Pre-election reports
- Queenstown Lakes Spatial Plan
- Reserve Management Plans
- Section 10A Reports
- Small Community Plans
- Strategies and Publications
- Submissions from QLDC
-
-
expand_more
Back
District Plan
- Operative District Plan
- Proposed District Plan
- ePlans
- National Policy Statement-Urban Development (District Plan Amendments)
- Urban Intensification Variation
- Te Pūtahi Ladies Mile Variation
- Private Plan Change Application - The Hills Resort Zone
- Upper Clutha Landscape Schedules Variation
- District Plan maps
- A Guide to Plan Changes
- Planning Matters - Planning & Development Newsletter
Shotover Wastewater Treatment Plant Upgrade
Upgrades will improve wastewater capacity in the district and provide for future growth in the area through to the year 2048.
Quick links
About the project
The Shotover Wastewater Treatment Plant currently services Whakatipu Basin communities of Queenstown, Arthurs Point, Frankton, Kelvin Heights, Quail Rise, Shotover Country, Lake Hayes Estate, Lake Hayes, and Arrowtown.
A third stage of upgrades to the plant are now underway to improve wastewater capacity in the district and provide for future growth through to the year 2048. Construction includes a second Modified Ludzack-Ettinger (MLE) reactor down by Shotover Delta, and a range of new equipment, technology and supporting infrastructure to help keep our district's pipes flowing.
Once complete, the new treatment process for wastewater will be handled by the two MLE reactors. This will ensure long-term compliance as more people choose to make the Whakatipu Basin their home and help to protect the environment, meeting tighter effluent consent limits if required by Otago Regional Council (ORC) in the future.
An existing oxidation pond will be repurposed as part of the works. Part of the pond will be used for improved stormwater management on site, with another area converted to act as a calamity pond in the event the treatment plant goes offline.
These upgrades will also allow the plant to receive additional wastewater flows from Jacks Point Village, Hanley Farm, Ladies Mile and an extension of the Quail Rise residential development area.
What's the latest?
Monday 21 October 2024
Crews expect to finish draining water from the pond into the other two on site on Wednesday 30 October.
There is the possibility this work may result in some odour around the facility once the pond has been drained. More details are available below in the ‘Management of odour’ section on this webpage.
15 May 2024
McDonnell Dowell's shared a video update of how upgrades are progressing at the Shotover Wastewater Treatment Plant. Watch it here.
Managing construction effects
Measures will be put in place by McConnell Dowell to mitigate any potential stormwater, dust, noise, and odour effects during construction.
The project's carbon footprint will be reduced by reusing spoil from the site, using sustainable materials, reducing transport emissions and the amount of steel and concrete used where possible.
Management of odour
By Wednesday 30 October, crews will have finished dredging one of the existing oxidation ponds and draining water from it into the other two ponds on site.
When all water is drained, some older sludge remaining at the bottom of the pond will need approximately four-to-six weeks to dry out before it’s collected and removed. While we don’t believe this remaining sludge will smell as it will be older and low in organic content, there is still the possibility of some odour in the area around the facility.
Crews will monitor smell from the pond and at different elevations nearby, and if required, will use aerosol cannons and lime neutralise the remaining sludge and disperse any odour.
About the treatment process
The Modified Ludzack-Ettinger (MLE) process sees raw sewage screened to remove the bulk of the non-degradable solids before it’s pumped through a series of tanks. The first tank starves the bacteria of oxygen, causing them to begin to break down elements in the wastewater in order to produce the oxygen they need to survive. The second tank then feeds the wastewater with an oversupply of oxygen, causing further biological processes that complete the stabilization of the organic matter, reducing the nitrogen concentration in the end product
The material is then pumped into a settling tank (a clarifier) that further separates and clarifies the resulting liquid. The processed clear water is then UV treated and pumped out of the system. Some of the remaining solids are then pumped back to the start of the process to begin it all over again, while the rest is pumped into a dewatering plant where it is dried out and removed, to be disposed of at an approved off-site location.
Any questions?
If you have any questions, please give us a call on 03 441 0499 or email services@qldc.govt.nz
Stay up-to-date
Sign up to our newsletters and stay up-to-date with the latest news, events & information in the Queenstown Lakes District.